Incident Action Plan (Lite) — Builder
Generate IAP
Copy
Incident Details
Incident Name
Incident Number
Controlling Agency
Select...
DFES
DBCA
LGA
Other (enter below)
Date and Time
Incident Level
Select...
Level 1
Level 2
Level 3
Developed By
Operational Period
Size
Position of Fire
The Fire is located in (Location), is approximately (distance) from (landmark/town) and is burning in a (direction) Direction
Fire Behavior
The Fire is currently burning in a mixture of (fuel type), its ROS is (speed) Km/h, with flame heights of (size), the fire intensity is (intensity). Important to note the weather conditions are (noteable weather conditions) with possible wind changes at (time).
Community Risks — Life
Residential Properties to the North
Community Risks — Infrastructure
Powerlines and Water Corp Infrastructure in the Fire Ground
Community Risks — Other
Plantation to the North
Objectives & Strategies
Protect
Communicate
Contain
Reinstate
Handover
Recovery
First row auto-loads P1, CM1, CT1. You can still edit text or choose another template.
Triggers & Decision Points
Triggers
Edit as needed. Tick “Include” to add to the output.
Decision Points
Edit as needed. Tick “Include” to add to the output.
Logistics & IMT
Catering
Supply
Medical Services
IMT Roles
Incident Controller (IC)
Operations Officer (OO)
Planning Officer (Plans)
Public Information Officer (PIO)
Liaison Officer (LO)
Safety Advisor (SA)
Resources
MSO
Intel
Operations & Comms
Ops Point Location
Comms Plan
Command Channel
Use Divisions
Add Division
Each division creates 5 editable sectors (first two are “Alpha” and “November”).
Safety Message
Possible Wind Change at (time and Direction), Crews are reminded to follow LACES, Be aware of Falling Trees, Traffic on Road Ways. Report all incidents via Chain of Command.
Generated IAP